|
Owner of data set GDA Sp. z o.o. |
Technical purpose Waterproofing and Sealing systems The scope of the EPD is "cradle to gate with options, modules C1–C4 and D". The following life cycle modules are included within the declared scope: A1 (Raw material supply), A2 (Transport), A3 (Manufacturing), A4 (Transport to customer), C1 |